Back
Camp Long Lodge Pre-Design Study
This project involves the pre-design study and cost estimation for the reconstruction of Camp Long Lodge, a historic facility within Camp Long Park in Seattle. The lodge sustained severe fire damage in 2024, requiring substantial structural rehabilitation and modernization. The scope includes restoring historic architectural elements while integrating modern building systems, accessibility improvements, and sustainability features. Planned upgrades include seismic retrofitting, installation of an elevator for full accessibility, replacement of mechanical, electrical, and plumbing systems, and the addition of fire suppression systems. The project also incorporates energy-efficient solutions such as all-electric systems, solar panel installation, and LEED Silver certification goals. Site improvements include outdoor gathering spaces, accessible parking, and EV charging infrastructure. The document outlines cost estimates, design considerations, and construction planning assumptions, with anticipated project delivery through a design-bid-build method.
Government Entity
Default
State
Default
RFP Number
Default
Budget
Not Assigned
Published Date
Default
Due Date
Default
Days remaining
Default
Proposal Submission
Default
North American Industry Classification System (NAICS)
Default
Default
Default
Natural Language Tags
Best Matches
Also Worth Exploring
# of RFPs: 19
# of RFPs: 19
# of RFPs: 19

