Environmental Consulting Services for FHWA Emergency Relief Storm Damage Repair Projects

PROPOSALS DUE

October 08, 2026, 5:00 pm PDT

Closed

WHAT THEY WANT

(Summarized from the RFP)

The County of Santa Cruz Department of Community Development and Infrastructure is seeking an environmental consulting firm to prepare batched Biological Assessments and provide regulatory permitting support for twenty-three storm-damage road repair projects across the County. The projects are funded through the Federal Highway Administration Emergency Relief Program and managed by Caltrans, and the contract is expected to run from approval through December 31, 2028.

CHANGES SINCE PUBLISHED

1 change

WHAT OTHERS ASKED

24 questions answered

▶

Does the County anticipate that construction of some projects will extend into the 2028 construction season?

Scope/requirements

▶

Who will be doing the engineering designs and what is the anticipated schedule for providing the consultants with 60% designs?

Scope/requirements

▶

Based on our review of the Example BAs and our understanding of BAs submitted for other projects with multiple locations, we assume two BAs are required. • One BA would be prepared for NMFS covering all work, listing those locations having potential to affect, and applying for coverage under the existing PBO Caltrans’ Routine Transportation-Management Activities Program in District 5. • One BA would be prepared for USFWS that includes all federally listed species including FYLF and CRLF, where those locations with potential to affect would be listed for each species respectively and coverage for the CRLF would be requested to be covered under the existing PBO for CRLF for Projects Funded or Approved under the Federal Highway Administration's Federal Aid Program. Can this assumption be confirmed?

Scope/requirements

▶

Exhibit F includes Guidance for CRLF PBO application - and includes that surveyor details are required. Based on the PBO, focused CRLF surveys are required only if determined necessary when work begins, and for the BA information from visual surveys from site visits are sufficient at the 20 locations (excluding North Rodeo Gulch Rd PM 3.77 - 15J9(062) and Redwood Lodge Rd PM 2.02 - 15J9(100), which do not have PES documents in Exhibit D, and are listed as no BA needed in Exhibit C) requiring PBO coverage. Can this assumption be confirmed?

Scope/requirements

▶

Exhibit F notes the FYLF survey protocol includes up to 8 visual surveys approx. 14 days apart between March and November. The contract is anticipated to start December 2026 and surveys cannot begin until March 1, 2027. Total time for surveys may exceed 16 weeks if cancellations occur due to weather conditions. Draft BAs anticipated April 1, 2027, and final BAs May 1, 2027. We assume surveys will be performed concurrent to BA preparation, and final FYLF survey information will not be included in draft BAs and may not be included in the final BAs dependent on timing. Can this assumption be confirmed?

Scope/requirements

▶

The RFP requests NEPA support. Please confirm CEQA services beyond the Archaeological Survey Report are not requested?

Scope/requirements

All 24 answers open with a free account.

ABOUT THIS RFP

RFP number

2026-RFP - Roads-079

Budget

Not Assigned

Published

Entity type

County

State

California

Summarized from the Santa Cruz County portal.

HOW TO SUBMIT

Submit an electronic PDF proposal through the County's OpenGov Procurement portal at https://procurement.opengov.com/portal/santacruzcounty, following the OpenGov uploading instructions in the RFP. All questions go through the portal; email inquiries are not accepted.

NAICS CODES & TAGS

541620

541330

Environmental Consulting

Regulatory Compliance and Permitting

Cultural Resource Management

ACROSS 539 RFPS

MORE THAN

1 in 5

1 in 5

RFPs changed their terms while active.

A week of proposal work, based on the published terms.

A week of proposal work, based on the published terms.

DAY 1 · PUBLISHED

PUBLISHED

DAY 16 · THE TERMS CHANGE

DAY 16 · TERMS CHANGE

DAY 25 · DUE

DUE

25 days is the median window from publication to due date; day 16 is the median first change for the 113 that changed. 539 RFPs published and due: July 23 - Sept. 30, 2026.

Bid on five RFPs, and the odds are better than two in three that at least one changes its terms before the deadline. Larger firms have staff tracking this. Start free and you’ll have it at your fingertips too.

This RFP has closed

Proposals were due October 08, 2026, 5:00 pm PDT. Leads tracks active RFPs from posting to deadline.

"The efficiency of the Leads platform allows us to determine if an RFP is worth the effort in minutes rather than hours. The results speak for themselves, we recently won our first bid, which we initially found on Leads!"

Kiana Stringfield

Founder, AKOMAKONNECT

"The efficiency of the Leads platform allows us to determine if an RFP is worth the effort in minutes rather than hours. The results speak for themselves, we recently won our first bid, which we initially found on Leads!"

Kiana Stringfield

Founder, AKOMAKONNECT

A week of proposal work, based on the published terms.

A week of proposal work, based on the published terms.

Unlocking access to government contracts

one RFP at a time.

Sign up for RFP Insights

We'll send you RFP insights and relevant updates to help you gain a competitive edge.

© 2026 RFPGo.ai, All rights reserved

Unlocking access to government contracts one RFP at a time.

Sign up for RFP Insights

We'll send you RFP insights and relevant updates to help you gain a competitive edge.

© 2026 RFPGo.ai, All rights reserved

Unlocking access to government

contracts one RFP at a time.

Sign up for RFP Insights

We'll send you RFP insights and relevant updates to help you gain a competitive edge.

© 2026 RFPGo.ai, All rights reserved