Back

City of Port Angeles
· City
· Washington
Professional Consulting Services for Water and Wastewater Supervisory Control and Data Acquisition System Upgrade
PROPOSALS DUE
October 21, 2026, 5:00 pm PDT
5 days left
WHAT THEY WANT
(Summarized from the RFP)
The City of Port Angeles Department of Public Works and Utilities is requesting Statements of Qualifications from consulting firms to evaluate and then upgrade the Supervisory Control and Data Acquisition (SCADA) systems that run its water and wastewater utilities. The engagement covers planning, engineering, integration and construction support for a comprehensive, multi-year upgrade of SCADA components at the water treatment plant (built 2010), the wastewater treatment plant (SCADA last upgraded 2013), the Elwha water treatment plant, sixteen sewer lift stations, five reservoir sites, two pump stations and a landfill gas flare. Both plants currently run different versions of WinCC on mainly Siemens PLC hardware.
DOCUMENT SET
1 document
· 249.3KB
CHANGES SINCE PUBLISHED
No amendments recorded yet. If the entity publishes changes, they will be summarized here.
WHAT OTHERS ASKED
No questions answered in writing yet — when the government entity answers, each one lands here, with the ones that change who can bid called out.
ABOUT THIS RFP
RFP number
PSA-2026-26
Budget
Not Assigned
Published
Entity type
City
State
Washington
Summarized from the City of Port Angeles portal.
HOW TO SUBMIT
Submit one electronic PDF copy of the full SOQ by email to lbaack@cityofpa.us with a copy to contracts@cityofpa.us; only emailed submittals are accepted and the City's incoming email timestamp is the receipt time. Maximum email size 20 MB; include "Water & Wastewater SCADA System Upgrade" in the subject line. SOQs are limited to ten single-sided 8.5x11 pages including the cover letter. Questions go by email to lbaack@cityofpa.us and contracts@cityofpa.us.
NAICS CODES & TAGS
541330
541512
541511
Water Resource Management
Architecture and Engineering Design
Capital Improvements Planning
Software Selection and Implementation
ACROSS 539 RFPS
MORE THAN
RFPs changed their terms while active.
25 days is the median window from publication to due date; day 16 is the median first change for the 113 that changed. 539 RFPs published and due: July 23 - Sept. 30, 2026.
Bid on five RFPs, and the odds are better than two in three that at least one changes its terms before the deadline. Larger firms have staff tracking this. Start free and you’ll have it at your fingertips too.
Free to open
free account required
A free account opens this RFP in full, starting with the rest of the description above — and 5 RFPs a week, no card.
Changes since published
Every amendment filed after it goes out, summarized.
What others asked
Every question the government entity answers in writing, with the ones that matter called out.
The documents
The set as published, in one folder or as direct links to the document.
Matched to you
The RFPs that fit the NAICS codes and tags you save; open up to 5 a week in full.

