Back

Hillsboro School District 1J
· Education
· Oregon
Architectural Services for the 2026 Bond Program
PROPOSALS DUE
November 23, 2026, 2:00 pm PST
7 days left
WHAT THEY WANT
(Summarized from the RFP)
Hillsboro School District 1J in Oregon is seeking written proposals from qualified architectural firms to form a pool of design teams for its 2026 Bond Program. The District intends to award contracts to multiple firms, and individual projects or groups of projects will then be assigned from the pool based on relevant experience, specialized expertise, and the capacity of each team to meet the needs and schedule of the assignment. Selection to the pool does not guarantee a fixed volume of work, and awards depend on the bond measure passing. Only architectural firms are selected through this solicitation; sub-consultants are chosen later during contract negotiations. The bond is anticipated at roughly $430 million and covers more than 500 scopes of work across over 40 projects, reaching every school and District support facility between 2027 and about 2031. Program areas include buildings and systems such as roofing, HVAC and lighting; safety and security; technology and cybersecurity infrastructure; career and college pathway spaces; extracurricular facilities such as track resurfacing, turf fields and auditorium renovations; and other needs such as kitchen remodels. Work may involve interior renovations, building envelope improvements, equipment replacement, site improvements, and minor additions.
DOCUMENT SET
5 documents
· 2MB
CHANGES SINCE PUBLISHED
2 changes
▶
833462_Addend_2_RFP_HSD Architectural Services.pdf
Compliance
▶
827806_Addend 1 - RFP - HSD Architectural Services.pdf
Compliance
This RFP has changed 2 times.
WHAT OTHERS ASKED
21 questions answered
▶
Request for contract revisions
Award & contract
▶
Can the District share an anticipated overall bond program schedule, including projected project start dates and major design and construction milestones?
Administrative
▶
Does the District have a specific COBID participation goal? How does the District intend to evaluate COBID participation?
Preference
▶
Should firms identify interest in specific types of project assignments based on experience and capacity?
Scope/requirements
▶
Attachment G, Pg 1 Anticipated Scope: Confirm civil, structural, mechanical, plumbing, electrical, landscape, and technology plus specialized consultants are not considered architectural disciplines. Those listed would be engineering or other disciplines determined to be required on a project-to-project basis.
Scope/requirements
▶
Confirm if proposals are to be bound or stapled.
Submission
All 21 answers, in full.
ABOUT THIS RFP
RFP number
2026-Arch 01
Budget
Not Assigned
Published
Entity type
Education
State
Oregon
Summarized from the Hillsboro School District 1J portal.
HOW TO SUBMIT
Submit hard copies in person or by delivery to Hillsboro School District 1J, Attn: John Abel, Cornerstone Management Group, 4901 SE Witch Hazel Road, Hillsboro, OR 97129. Page limits, required forms and contacts are in the full RFP.
NAICS CODES & TAGS
541310
541330
Architecture and Engineering Design
ACROSS 1,040 RFPS
MORE THAN
Bid on five RFPs, and the odds are better than two in three that at least one changes its terms before the deadline. Larger firms have staff watching this. So can you. Get every change on this RFP for $9, or every RFP free for 7 days.
A week of proposal work, based on the published terms.
DAY 18 · CHANGE
28 days is the median window from publication to due date; day 18 is the median first change for the 216 that changed. 1,040 RFPs published and due between July 23 and Oct. 31, 2026.
Every RFP: 7 days free
Leads plan
Every active RFP in CA, WA, OR and ID, and what you need to decide on each.
Find the right RFPs: search in your own words, see your matches and get a weekly digest
Decide whether to bid: who can bid, insurance, key dates and who to ask, cited to the documents
Stay on top of changes: every change and answer tagged by what it affects, with emails on the RFPs you track
Then $59/mo, or $47/mo billed annually. Cancel anytime.
Just this RFP: $9, once
No account
Everything on this one RFP, on your RFP page the moment you pay.
Analysis cited to the source documents
Every source document, one click away
An email the evening it changes, until it’s due
One payment. No subscription, no account.
MORE RFPS LIKE THIS
Other RFPs in Environmental, Engineering & Infrastructure
Active across California, Washington, Oregon and Idaho, closing soonest first.

City of Morgan Hill
· California
Professional Electrical Engineering Services
Due 7d
View RFP →

City of Corona
· California
Microgrid Feasibility Study for Lester Water Treatment Plant and Chase Booster Station
Due 7d
Updated
View RFP →

City of Dinuba
· California
Utility Rate Study Water, Sewer, and Solid Waste Disposal
Due 7d
Updated
View RFP →
