Back

California Polytechnic State University, San Luis Obispo
· Education
· California
Campus Consulting Landscape Architecture Services
PROPOSALS DUE
December 01, 2026, 3:00 pm PST
15 days left
WHAT THEY WANT
(Summarized from the RFP)
California Polytechnic State University, San Luis Obispo (Cal Poly), through its Facilities Planning and Capital Projects department, is seeking a Campus Consulting Landscape Architect to provide campus landscape planning and design consulting under a master agreement. Services are delivered project by project and may include initial site design, conceptual landscape design, site inventory and analysis, and refined design review. As needed, the consultant also completes later-phase landscape, ADA, site survey, design and construction documents, and supports select projects during construction administration. The consultant will help develop a unifying vision for the campus landscape, elevate the aesthetic quality of open spaces, and support student life in education, recreation and socialization areas. Project areas include natural and open spaces, public realm improvements, multi-use exterior spaces, vehicular, bike and pedestrian corridors, streetscape and parking. Cal Poly anticipates several small to medium projects over the next one to five years that add pedestrian and multi-modal connectivity, seating, shade, paving and lighting, with construction budgets estimated between $60,000 and $925,000 each. Candidate projects include Campus Core Circulation Improvement, Grand Avenue Continued Renovation, Village Drive Renovation, North Perimeter Renovation, several phases of the OCOB landscape, Student Health Center Expansion and Recreational Center Expansion.
DOCUMENT SET
3 documents
· 37MB
CHANGES SINCE PUBLISHED
6 changes
This RFP has changed 6 times.
WHAT OTHERS ASKED
15 questions answered
▶
The RFP references a collaborative design-build delivery model and indicates that the selected Campus Consulting Landscape Architect will work alongside a design-build contractor. Please clarify whether respondents are expected to identify and team with a specific design-build contractor as part of their proposal, or if the selected landscape architect will be paired with Cal Poly's existing on-call or project-specific design-build contractor(s) following award. If proposer-led teaming is anticipated, should the design-build contractor be included as part of the proposed team and qualifications package?
Scope/requirements
▶
Please confirm that any comments regarding the Professional Services Agreement can be placed in the Appendix and will not be part of the page count.
Submission
▶
Are you only selecting one firm for the Campus Consulting Landscape Architecture Services contract?
Award & contract
▶
Do you want a Letter included that is not part of the page count? If so, who do we direct the letter too?
Submission
▶
Would you please confirm the design + construction fees and provide a more concrete number?
Pricing
▶
If this position has been filled previously, is the former Consulting Landscape Architect precluded from participation? Can the University provide respondents with the name of the pre-selected third-party design-build contractor currently on the evaluation team? Will the selected Landscape Architect contract directly with the University, or will we be sub-contracted under the pre-selected Design-Build Contractor? Can you confirm that the University is looking to select a single, exclusive Campus Consulting Landscape Architect for all listed projects, or whether a pool of firms will be selected under an on-call Master Services Agreement (MSA)? Is there a guaranteed minimum work volume or baseline retainer for the initial 2-year term, or is the contract strictly 'as-needed' with zero guaranteed volume? Of the 26 potential projects listed, how many are expected to kick off simultaneously in Q1/Q2 of 2027? What is the expected frequency of mandatory in-person site visits, workshops, or Project Working Team (PWT) meetings on the San Luis Obispo campus? Are the hourly rates submitted in the Cost Proposal fixed for the entire initial 2-year term, or is there an allowance for annual escalation?
Eligibility · Award & contract · Pricing · Scope/requirements
All 15 answers, in full.
ABOUT THIS RFP
RFP number
JEM102726
Budget
Not Assigned
Published
Entity type
Education
State
California
Summarized from the California Polytechnic State University, San Luis Obispo portal.
HOW TO SUBMIT
Respond in A3 format: three single-sided 11 x 16.5 inch pages, with a separate appendix holding one-page resumes and the firm's California Department of Industrial Relations registration number. Page limits, required forms and contacts are in the full RFP.
NAICS CODES & TAGS
541320
Architecture and Engineering Design
ACROSS 1,040 RFPS
MORE THAN
Bid on five RFPs, and the odds are better than two in three that at least one changes its terms before the deadline. Larger firms have staff watching this. So can you. Get every change on this RFP for $9, or every RFP free for 7 days.
A week of proposal work, based on the published terms.
DAY 18 · CHANGE
28 days is the median window from publication to due date; day 18 is the median first change for the 216 that changed. 1,040 RFPs published and due between July 23 and Oct. 31, 2026.
Every RFP: 7 days free
Leads plan
Every active RFP in CA, WA, OR and ID, and what you need to decide on each.
Find the right RFPs: search in your own words, see your matches and get a weekly digest
Decide whether to bid: who can bid, insurance, key dates and who to ask, cited to the documents
Stay on top of changes: every change and answer tagged by what it affects, with emails on the RFPs you track
Then $59/mo, or $47/mo billed annually. Cancel anytime.
Just this RFP: $9, once
No account
Everything on this one RFP, on your RFP page the moment you pay.
Analysis cited to the source documents
Every source document, one click away
An email the evening it changes, until it’s due
One payment. No subscription, no account.
MORE RFPS LIKE THIS
Other RFPs in Environmental, Engineering & Infrastructure
Active across California, Washington, Oregon and Idaho, closing soonest first.

City of Morgan Hill
· California
Professional Electrical Engineering Services
Due 7d
View RFP →

Hillsboro School District 1J
· Oregon
Architectural Services for the 2026 Bond Program
Due 7d
Updated
View RFP →

City of Corona
· California
Microgrid Feasibility Study for Lester Water Treatment Plant and Chase Booster Station
Due 7d
Updated
View RFP →
