Back

City of Pasadena
· City
· California
Clean Power Pasadena Partnership for the Water and Power Department, Power Supply
PROPOSALS DUE
October 30, 2026, 3:00 pm PDT
11 days left
WHAT THEY WANT
(Summarized from the RFP)
The City of Pasadena, through its Department of Water and Power (PWP), is soliciting proposals from developers of distributed generation renewable energy facilities to be located within PWP's electric service territory and interconnected directly to PWP's electric distribution grid. PWP is seeking one or more new, greenfield distributed energy resources larger than 200 kilowatts (kW) in capacity, with a preferred commercial operation date on or before December 31, 2028, and a minimum delivery term of 10 years (with a preferred 20-year delivery period). Later commercial operation dates and alternative delivery terms will be considered.
DOCUMENT SET
8 documents
· 2.2MB
Request for Proposals — full solicitation.pdf · 1.2MB
Addendum 1 — questions and answers.pdf · 210KB
Attachment A — scope of work and deliverables.pdf · 480KB
Attachment B — cost proposal form.xlsx · 64KB
Sample agreement and insurance requirements.pdf · 560KB
Pre-proposal meeting — sign-in sheet and slides.pdf · 1.8MB
More in the folder — every document opens with a free account.
CHANGES SINCE PUBLISHED
3 changes
WHAT OTHERS ASKED
11 questions answered
▶
When will responses to proposals be received from PWP after the October 30th deadline? Any detail on turnaround time would be very helpful to the design of our overall project.
Administrative
▶
Do the conceptual site plan and single-line diagram count toward the 50-page cap?
Compliance
▶
Pages 41–42 describe a 5% bid bond "if required". Is one required here?
Eligibility
▶
The introduction (p. 3) says a 10-year minimum; 6.4 (p. 22) says 20 years. Which does PWP expect, and is either scored differently?
Scope/requirements · Preference
▶
The Interconnection Agreement (Section 11) says projects under 1 MW carry $1M and larger ones are negotiated. The RFP (p. 20) and Term Sheet item 17 set $2M for 1 to 3 MW. Which applies to a 1.05 MW facility, and is size measured AC or DC?
Eligibility · Scope/requirements
▶
Will there be a second RFP?
Award & contract
All 11 answers open with a free account.
ABOUT THIS RFP
RFP number
2026-RFP-0417
Budget
Not Assigned
Published
Entity type
City
State
California
Summarized from the City of Pasadena portal.
HOW TO SUBMIT
Proposals must be submitted electronically through the City of Pasadena's eProcurement Portal (https://procurement.opengov.com/portal/pasadena/projects/283432). All required documents must be uploaded through the portal. Paper or email submissions are not accepted.
NAICS CODES & TAGS
541690
541990
541611
Sustainability Consulting
Environmental Consulting
Regulatory Compliance and Permitting
ACROSS 539 RFPS
MORE THAN
RFPs changed their terms while active.
25 days is the median window from publication to due date; day 16 is the median first change for the 113 that changed. 539 RFPs published and due: July 23 - Sept. 30, 2026.
Bid on five RFPs, and the odds are better than two in three that at least one changes its terms before the deadline. Larger firms have staff tracking this. Start free and you’ll have it at your fingertips too.
Free to open
free account required
A free account opens this RFP in full, starting with the rest of the description above — and 5 RFPs a week, no card.
Changes since published
3 changes filed since it went out, each one summarized, so a date or a requirement never shifts without you knowing.
What others asked
11 questions the government entity answered in writing — the answers bind.
The documents
The set as published, in one folder or as direct links to the document.
Matched to you
The RFPs that fit the NAICS codes and tags you save; open up to 5 a week in full.

