Back

City of Paso Robles

· City

· California

Engineering Design Services for 24-Inch Potable Water Main Highway Crossing

PROPOSALS DUE

November 30, 2026, 3:00 pm PST

14 days left

Deadline moved · was Nov 18 → now Nov 30 · +12 days

WHAT THEY WANT

(Summarized from the RFP)

The City of Paso Robles is seeking a qualified engineering firm to provide design, permitting, and related professional services for the 24-Inch Potable Water Main Highway Crossing, identified in the City's Water Master Plan as Project C1, Northern Portion. The project consists of approximately 230 linear feet of 24-inch potable water transmission main installed within a casing beneath Highway 46, and it is intended to correct build-out deficiencies for future single-family and multi-family development in the eastern and southeastern parts of the water system. It will also loop existing mains along Wisteria Lane to add redundancy and increase fire flow to commercial areas near the airport. The consultant's scope runs from preliminary engineering through bid support. Work begins with project management, monthly reporting, QA/QC review, and the coordination meetings the proposer recommends. A Basis of Design and Constructability Evaluation technical memorandum will compare horizontal alignments, profiles, casing configurations, and trenchless construction methods, and recommend a preferred approach with a preliminary construction cost estimate. Supporting investigations include topographic survey and base mapping, right-of-way and easement research, utility potholing and conflict identification, and a geotechnical investigation with trenchless design recommendations for bore or jacking pits, groundwater control, and settlement monitoring.

CHANGES SINCE PUBLISHED

2 changes

This RFP has changed 2 times.

For $9, get your RFP page: analysis cited to its documents, every file, every change so far and an email at the next. No account needed.

$9 gets the analysis, the documents, every change and an email at the next.

ABOUT THIS RFP

RFP number

UD 26-04

Budget

Not Assigned

Published

Entity type

City

State

California

Summarized from the City of Paso Robles portal.

HOW TO SUBMIT

Submit two hardcopies and one electronic copy (PDF) delivered to the City of Paso Robles, Attn: Rosalyn Piza, P.E., Utility Engineer, 1000 Spring Street, Paso Robles, CA 93446; the delivery block also lists the email [email in the full RFP]. Page limits, required forms and contacts are in the full RFP.

NAICS CODES & TAGS

541330

541370

Architecture and Engineering Design

Water Resource Management

Regulatory Compliance and Permitting

ACROSS 1,040 RFPS

MORE THAN

1 in 5

1 in 5

RFPs changed their terms while active.

RFPs changed their terms while active.

2 changes filed on this RFP — now due Nov 30, was Nov 18.

2 changes filed on this RFP — now due Nov 30, was Nov 18.

Bid on five RFPs, and the odds are better than two in three that at least one changes its terms before the deadline. Larger firms have staff watching this. So can you. Get every change on this RFP for $9, or every RFP free for 7 days.

A week of proposal work, based on the published terms.

DAY 1 · PUBLISHED

PUBLISHED

DAY 18 · CHANGE

DAY 28 · DUE

DUE

28 days is the median window from publication to due date; day 18 is the median first change for the 216 that changed. 1,040 RFPs published and due between July 23 and Oct. 31, 2026.

Every RFP: 7 days free

Leads plan

Every active RFP in CA, WA, OR and ID, and what you need to decide on each.

Find the right RFPs: search in your own words, see your matches and get a weekly digest

Decide whether to bid: who can bid, insurance, key dates and who to ask, cited to the documents

Stay on top of changes: every change and answer tagged by what it affects, with emails on the RFPs you track

Then $59/mo, or $47/mo billed annually. Cancel anytime.

Just this RFP: $9, once

No account

Everything on this one RFP, on your RFP page the moment you pay.

Analysis cited to the source documents

Every source document, one click away

An email the evening it changes, until it’s due

One payment. No subscription, no account.

Unlocking access to government contracts

one RFP at a time.

Sign up for RFP Insights

We'll send you RFP insights and relevant updates to help you gain a competitive edge.

© 2026 RFPGo.ai, All rights reserved

Unlocking access to government contracts one RFP at a time.

Sign up for RFP Insights

We'll send you RFP insights and relevant updates to help you gain a competitive edge.

© 2026 RFPGo.ai, All rights reserved

Unlocking access to government

contracts one RFP at a time.

Sign up for RFP Insights

We'll send you RFP insights and relevant updates to help you gain a competitive edge.

© 2026 RFPGo.ai, All rights reserved