Engineering Services for Tanglewood and Sunset Well Control Buildings and Infrastructure Design
PROPOSALS DUE
November 13, 2026, 4:00 pm PST
8 days left
WHAT THEY WANT
(Summarized from the RFP)
The South Tahoe Public Utility District is seeking proposals from qualified engineering firms to provide design services for the Tanglewood Well and Sunset Replacement Well control buildings and water system connection infrastructure. The selected consultant will develop plans and specifications for two municipal well sites in South Lake Tahoe, California, and will also be responsible for obtaining necessary project permits, including conducting an initial study and providing recommendations compliant with the California Environmental Quality Act. Work will be performed under the District's Master Services Agreement for Consulting Services and a Task Order for a defined scope.
DOCUMENT SET
1 document
· 7.1MB
WHAT OTHERS ASKED
14 questions answered
▶
Under Section 7: Technical Proposal: it specifies the project schedule, and materials in the appendix will not count towards the 14-page limit. Does this exemption also apply to a front or back cover, divider page, or table of contents pages?
Compliance
▶
Can the District elaborate on the design team’s desired involvement in the public outreach/engagement process, including whether the design team should lead or support it? If leading, should the design team’s communications staff develop a schedule and plan for outreach or follow a District defined plan for the schedule and scope of outreach?
Scope/requirements
▶
Would it be acceptable to include a graphic on an 11x17 sheet? If so, would it count as one page or two toward the overall page limit?
Submission
▶
What coordination has taken place with TRPA to date?
Compliance
▶
Section 7 of the RFP does not list a detailed scope of work as a required proposal component, and Section 4 notes the District will accept alternative task breakdowns. Should proposers include a detailed scope of work describing tasks, deliverables, and assumptions? If so, may it be included as an appendix that does not count toward the 14-page limit?
Submission
▶
The schedule identifies 90% design completion in November 2027 (page 11 of the PDF), followed by final construction documents in February 2027, which appears inconsistent with subsequent bidding/construction milestones. Can the District provide a corrected schedule for both facilities?
Scope/requirements
All 14 answers open with a free account.
ABOUT THIS RFP
RFP number
Not Assigned
Budget
Not Assigned
Published
Entity type
Other government entity
State
California
Summarized from the South Tahoe Public Utility District portal.
HOW TO SUBMIT
All submittals are received electronically through the District's Vendor Portal at http://www.planetbids.com/portal/portal.cfm?CompanyID=21516. All proposers must register as a vendor through the portal; for assistance registering, contact Star Glaze, Contracts Administrator, at (530) 543-6205. Interested parties submit through the portal one electronic copy in PDF format of their Technical and Cost Proposal. The Technical Proposal and a cost estimate must both be submitted, and a project schedule detailing the steps and deliverables is required; the schedule and any appendix material are exempt from the page limit. Where a subconsultant accounts for more than 10 percent of total project cost, the proposal must include similar information for that firm. Proposals are addressed to Mark Seelos, Water Resources Manager, South Tahoe Public Utility District, 1275 Meadow Crest Drive, South Lake Tahoe, CA 96150. By submitting a proposal the consultant acknowledges receipt of the grant forms and agrees to maintain documentation supporting periodic progress reporting and monthly invoicing.
NAICS CODES & TAGS
541330
541620
541310
Architecture and Engineering Design
Water Resource Management
Regulatory Compliance and Permitting
ACROSS 539 RFPS
MORE THAN
RFPs changed their terms while active.
25 days is the median window from publication to due date; day 16 is the median first change for the 113 that changed. 539 RFPs published and due between July 23 and Sept. 30, 2026.
Bid on five RFPs, and the odds are better than two in three that at least one changes its terms before the deadline. Larger firms have staff watching this. Start free and see every change on the RFPs you open.
Free to open
free account required
A free account opens this RFP, starting with the rest of the description above, and up to 5 RFPs a week, no card.
See what they want, how to submit and the source documents
See every change and the answers other firms got
See RFPs matched to your NAICS codes and tags
Describe the work and find it: 10 AI searches a week
A 7-day trial of Leads opens every RFP
It adds 20 AI searches a day, who can bid, the insurance required, every key date and who to ask, with analysis cited to the documents it came from.