South Tahoe Public Utility District
· Other government entity
· California
Engineering Services for Tanglewood and Sunset Well Control Buildings and Infrastructure Design
PROPOSALS DUE
November 13, 2026, 4:00 pm PST
28 days left
WHAT THEY WANT
(Summarized from the RFP)
The South Tahoe Public Utility District is seeking proposals from qualified engineering firms to provide design services for the Tanglewood Well and Sunset Replacement Well control buildings and water system connection infrastructure. The selected consultant will develop plans and specifications for two municipal well sites in South Lake Tahoe, California, and will also be responsible for obtaining necessary project permits, including conducting an initial study and providing recommendations compliant with the California Environmental Quality Act. Work will be performed under the District's Master Services Agreement for Consulting Services and a Task Order for a defined scope.
DOCUMENT SET
1 document
· 7.1MB
CHANGES SINCE PUBLISHED
1 change
WHAT OTHERS ASKED
9 questions answered
▶
The schedule identifies 90% design completion in November 2027 (page 11 of the PDF), followed by final construction documents in February 2027, which appears inconsistent with subsequent bidding/construction milestones. Can the District provide a corrected schedule for both facilities?
Scope/requirements
▶
Does the District anticipate one combined set of construction documents (plans/specifications) for both facilities or separate design packages corresponding to each site?
Submission · Scope/requirements
▶
The RFP does not specifically identify geotechnical investigation requirements. Should the Consultant include new geotechnical investigations/reports at both sites or does the District have existing geotechnical information available? Should we include geotechnical construction phase services in the proposal, including foundation observations, compaction testing, materials testing, special inspections, etc., or will these services be provided separately by the District?
Scope/requirements · Pricing
▶
Are the RFP allowances for 5 pre-bid RFIs, 50 construction RFIs, 150 submittals, and 5 PCOs intended to cover both facilities combined or each facility separately? Are there specific expectations for duration and frequency of construction meetings, site inspections, and other construction management services that need to be included?
Scope/requirements · Pricing
▶
Can the District clarify whether the consultant is expected to be the lead on the CEQA and TRPA permitting processes through approval, or is it the District’s intent for the consultant to primarily provide technical/supporting documentation for District managed/led CEQA and TRPA efforts?
Scope/requirements
▶
Does the District anticipate that actual SCADA/RTU programming, integration, and commissioning will be performed by District staff, a separate integrator under the contractor, or should these services be included in the consultant's scope?
Scope/requirements
All 9 answers open with a free account.
ABOUT THIS RFP
RFP number
Not Assigned
Budget
Not Assigned
Published
Entity type
Other government entity
State
California
Summarized from the South Tahoe Public Utility District portal.
HOW TO SUBMIT
All submittals are received electronically through the District's Vendor Portal at http://www.planetbids.com/portal/portal.cfm?CompanyID=21516. All proposers must register as a vendor through the portal; for assistance registering, contact Star Glaze, Contracts Administrator, at (530) 543-6205. Interested parties submit through the portal one electronic copy in PDF format of their Technical and Cost Proposal. The Technical Proposal and a cost estimate must both be submitted, and a project schedule detailing the steps and deliverables is required; the schedule and any appendix material are exempt from the page limit. Where a subconsultant accounts for more than 10 percent of total project cost, the proposal must include similar information for that firm. Proposals are addressed to Mark Seelos, Water Resources Manager, South Tahoe Public Utility District, 1275 Meadow Crest Drive, South Lake Tahoe, CA 96150. By submitting a proposal the consultant acknowledges receipt of the grant forms and agrees to maintain documentation supporting periodic progress reporting and monthly invoicing.
NAICS CODES & TAGS
541330
541620
541310
Architecture and Engineering Design
Water Resource Management
Regulatory Compliance and Permitting
ACROSS 539 RFPS
MORE THAN
RFPs changed their terms while active.
25 days is the median window from publication to due date; day 16 is the median first change for the 113 that changed. 539 RFPs published and due: July 23 - Sept. 30, 2026.
Bid on five RFPs, and the odds are better than two in three that at least one changes its terms before the deadline. Larger firms have staff tracking this. Start free and you’ll have it at your fingertips too.
Free to open
free account required
A free account opens this RFP in full, starting with the rest of the description above — and 5 RFPs a week, no card.
Changes since published
1 change filed since it went out, summarized, so a date or a requirement never shifts without you knowing.
What others asked
9 questions the government entity answered in writing — the answers bind.
The documents
The set as published, in one folder or as direct links to the document.
Matched to you
The RFPs that fit the NAICS codes and tags you save; open up to 5 a week in full.