Back

Quileute Tribe
· Tribal government
· Washington
Professional Engineering Services and Project Management Support for FS-2918/Sol Duc Hot Springs Fish Passage Designs
PROPOSALS DUE
December 08, 2026, 4:00 pm PST
27 days left
WHAT THEY WANT
(Summarized from the RFP)
The Quileute Tribe, through Quileute Natural Resources, seeks qualified environmental engineering firms to design replacements for up to five undersized, fish-blocking culverts at road and stream crossings in Olympic National Park. The crossings sit on two unnamed tributaries to the upper Sol Duc River, known as Nelson Creek and Beaver Pond. Three are on the Sol Duc Hot Springs Road, a paved two-lane visitor corridor, and two are on FS-2918, a single-lane paved road used for timber access and dispersed recreation.
DOCUMENT SET
6 documents
· 6.2MB
Request for Proposals — full solicitation.pdf · 1.2MB
Addendum 1 — questions and answers.pdf · 210KB
Attachment A — scope of work and deliverables.pdf · 480KB
Attachment B — cost proposal form.xlsx · 64KB
Sample agreement and insurance requirements.pdf · 560KB
Pre-proposal meeting — sign-in sheet and slides.pdf · 1.8MB
CHANGES SINCE PUBLISHED
No amendments recorded yet. If the entity publishes changes, they will be summarized here.
WHAT OTHERS ASKED
No questions answered in writing yet — when the government entity answers, each one lands here, with the ones that change who can bid called out.
ABOUT THIS RFP
RFP number
2026-2918SD-AOP
Budget
Not Assigned
Published
Entity type
Tribal government
State
Washington
Summarized from the Quileute Tribe portal.
HOW TO SUBMIT
Email a PDF proposal (preferred) to the Deputy Director of Natural Resources, Brad Silet, copying the Tribe's Purchasing Specialist, or hand-deliver or mail it to Quileute Natural Resources in La Push, WA. Hand-delivered or mailed proposals need three copies plus a digital copy on a USB drive. Complete the RFP Response Form (Appendix A) and Bid Tabulation Table (Appendix B); an alternate format is accepted if it gives equivalent information. Include a certification that the firm is not suspended or debarred under 2 CFR 200.214. Late submissions are not considered, and the bidder must confirm receipt.
NAICS CODES & TAGS
541330
541370
Architecture and Engineering Design
Watershed and Habitat Restoration Strategy
ACROSS 539 RFPS
MORE THAN
RFPs changed their terms while active.
25 days is the median window from publication to due date; day 16 is the median first change for the 113 that changed. 539 RFPs published and due between July 23 and Sept. 30, 2026.
Bid on five RFPs, and the odds are better than two in three that at least one changes its terms before the deadline. Larger firms have staff watching this. So can you. Get every change on this RFP for $9, or on every RFP free for 7 days.
Every RFP: 7 days free
Leads plan
Every active RFP in CA, WA, OR and ID, and what you need to decide on each.
Find the right RFPs: search in your own words, see your matches and get a weekly digest
Decide whether to bid: who can bid, insurance, key dates and who to ask, cited to the documents
Stay on top of changes: every change and answer tagged by what it affects, with emails on the RFPs you track
Then $59/mo, or $47/mo billed annually. Cancel anytime.
Just this RFP: $9, once
No account
Everything on this one RFP, on your RFP page the moment you pay.
Analysis cited to the source documents
Every source document, one click away
An email the evening it changes, until it’s due
One payment. No subscription, no account.

