Back

City of Chino
· City
· California
Emergency Power Study for Water Facilities and Design Services for Emergency Power Backup Generator at Benson Site
PROPOSALS DUE
October 26, 2026, 10:00 am PDT
27 days left
WHAT THEY WANT
(Summarized from the RFP)
The City of Chino is seeking a consulting engineering firm to conduct an emergency power study covering eight City-owned potable water facilities and to deliver complete design, permitting, and bid-support services for a new emergency backup generator at the Benson Site (Project No. WA253). The City serves about 86,000 residents and more than 3,600 businesses, and its preliminary 2026 assessment found that a seven-day regional power outage combined with the loss of wholesale water supplies could interrupt water service citywide within about three days.
DOCUMENT SET
5 documents
· 20.1MB
CHANGES SINCE PUBLISHED
No amendments recorded yet. If the entity publishes changes, they will be summarized here.
WHAT OTHERS ASKED
No questions answered in writing yet — when the government entity answers, each one lands here, with the ones that change who can bid called out.
ABOUT THIS RFP
RFP number
2026-0003
Budget
Not Assigned
Published
Entity type
City
State
California
Summarized from the City of Chino portal.
HOW TO SUBMIT
Submit online only through the City of Chino PlanetBids portal (https://www.planetbids.com/portal/portal.cfm?CompanyID=26384); registration is required and no other method is accepted. Upload two files: File 1 with Part 1 (PSA exhibits: approach, acknowledgement of sample PSA terms, schedule of performance; 15-page limit) and Part 2 (cover letter, firm experience, team, three references, conflict of interest and insurance acknowledgements, and a sample work product of up to three pages as Appendix A; 20-page limit); File 2 with the separate fee proposal itemized by task, rate, hours and role. Proposals must not be marked confidential and must remain valid for 120 days. Questions only through PlanetBids.
NAICS CODES & TAGS
541330
Architecture and Engineering Design
Water Resource Management
Energy and Utility Consulting
ACROSS 310 RFPS
RFPs changed their terms while active.
22 days is the median window from publication to due date; day 14 is the median first change for the 62 that changed. 310 RFPs published from July 23 to September 14, 2026.
Larger firms have people on staff to track this information. Start for free today and you'll have this information at your fingertips as well.
Free to open
free account required
A free account opens this RFP in full, starting with the rest of the description above — and 5 RFPs a week, no card.
Changes since published
Every amendment filed after it goes out, summarized.
What others asked
Every question the government entity answers in writing, with the ones that matter called out.
The documents
The set as published, in one folder or as direct links to the document.
Matched to you
The RFPs that fit the NAICS codes and tags you save; open up to 5 a week in full.

