Back

City of Stanton
· City
· California
Facility Assessment Report Services for the Public Safety Center – Sheriff Station Upgrades Project
PROPOSALS DUE
October 20, 2026, 10:00 am PDT
33 days left
WHAT THEY WANT
The City of Stanton Public Works and Engineering Department is seeking a California-licensed architect or professional engineer with at least five years of experience to prepare a Facility Assessment Report for the City's Public Safety Center – Sheriff Station at 11100 Cedar Street. The City received a Community Project Funding grant from the U.S. Department of Housing and Urban Development (Federal Award B-24-CP-CA-0148) to improve the station, and needs an independent assessment that verifies and prioritizes the grant-funded improvements, identifies other facility deficiencies, and provides the cost estimates and environmental-clearance guidance the City needs to move the project into design and construction. This is a re-issue of the solicitation the City first advertised in August 2026.
CHANGES SINCE PUBLISHED
No amendments — so the deadline and requirements on this page are the ones that still apply.
WHAT OTHERS ASKED
No questions answered in writing yet — when the government entity answers, each one lands here, with the ones that change who can bid called out.
ABOUT THIS RFP
RFP number
RFP-041
Budget
Not Assigned
Published
Entity type
City
State
California
HOW TO SUBMIT
Hard-copy submission in a sealed envelope to the City of Stanton Department of Public Works and Engineering, 7800 Katella Avenue, Stanton, CA 90680. Submit three bound copies of the proposal on 8.5 x 11 sheets (11 x 17 for fold-out drawings), limited to 25 pages excluding resumes, tabs, and covers, with a Letter of Transmittal addressed to Daniel Herrera, Engineering Assistant, acknowledging addenda and holding the offer valid for 90 days. Required contents include firm history, key personnel and resumes, project understanding and work plan, sub-consultants, government references, schedule, evidence of insurance compliance, exceptions and deviations, the signed Exhibit A Proposal Acknowledgement Form, and the signed Exhibit B Title VI Compliance Certification (omitting either form disqualifies the proposal). The fee proposal, with a total project cost, hourly rate schedule, and staff-hour table by task, goes in a separate sealed envelope. Questions by email to DHerrera@StantonCA.gov.
NAICS CODES & TAGS
541310
541330
541350
Building Code Assessment
Architecture and Engineering Design
Capital Improvements Planning
ACROSS 310 RFPS
RFPs changed its terms while active.
The bar is a week of your proposal work, on the terms as published.
22 days is the median window from publication to the due date as published across all 310; day 14 is the median first change across the 62 that changed. 310 RFPs published from July 23 and due by September 14, 2026.
Larger firms have people on staff to track this information. Start for free today and you'll have this information at your fingertips as well.
Free to open
free account required
A free account opens this RFP in full, starting with the rest of the description above — and 5 RFPs a week, no card.
Changes since published
Every amendment filed after it goes out, summarized.
What others asked
Every question the government entity answers in writing, with the ones that matter called out.
The documents
The set as published, in one folder or as direct links to the document.
Matched to you
The RFPs that fit the NAICS codes and tags you save; open up to 5 a week in full.

