Back

City of Richland

· City

· Washington

Lamb Weston Effluent Wastewater Treatment Plant Capacity Upgrade Study

PROPOSALS DUE

October 06, 2026, 3:00 pm PDT

Closed

WHAT THEY WANT

(Summarized from the RFP)

The City of Richland, Washington is soliciting statements of qualifications from consultants for engineering design services to stress test the city's Wastewater Treatment Plant (WWTP) against a temporary, high-strength industrial discharge from Lamb Weston. The WWTP, built in 1985, is a 12 million-gallon-per-day complete-mix activated sludge plant fed by roughly 278 miles of sewer and operated by a staff of about 22 under the Wastewater/Stormwater Manager. The city wants to know whether the treatment system can absorb the added load, and on what conditions, before the discharge begins.

CHANGES SINCE PUBLISHED

1 change

ABOUT THIS RFP

RFP number

26-0072

Budget

$30,000

Published

Entity type

City

State

Washington

Summarized from the City of Richland portal.

HOW TO SUBMIT

Submit one original electronic submittal through Public Purchase (www.publicpurchase.com) under the City of Richland page; responders must be registered with PublicPurchase.com, and registration can take up to 24 hours; hand, fax, telephone, email and postal submittals are not accepted; organize the submittal as Preface (Attachment A RFQ Signature Form and Addendum Acknowledgement plus a current IRS W-9), Executive Summary (4-page limit), Project Approach and Schedule (10-page limit excluding two-page resumes) and Related Project Experience/References (5-page limit); questions in writing to purchasing@richlandwa.gov, (509) 942-7710.

NAICS CODES & TAGS

541330

541690

541620

Water Resource Management

Architecture and Engineering Design

ACROSS 539 RFPS

MORE THAN

1 in 5

1 in 5

RFPs changed their terms while active.

A week of proposal work, based on the published terms.

A week of proposal work, based on the published terms.

DAY 1 · PUBLISHED

PUBLISHED

DAY 16 · THE TERMS CHANGE

DAY 16 · TERMS CHANGE

DAY 25 · DUE

DUE

25 days is the median window from publication to due date; day 16 is the median first change for the 113 that changed. 539 RFPs published and due: July 23 - Sept. 30, 2026.

Bid on five RFPs, and the odds are better than two in three that at least one changes its terms before the deadline. Larger firms have staff tracking this. Start free and you’ll have it at your fingertips too.

This RFP has closed

Proposals were due October 06, 2026, 3:00 pm PDT. Leads tracks active RFPs from posting to deadline.

"The efficiency of the Leads platform allows us to determine if an RFP is worth the effort in minutes rather than hours. The results speak for themselves, we recently won our first bid, which we initially found on Leads!"

Kiana Stringfield

Founder, AKOMAKONNECT

"The efficiency of the Leads platform allows us to determine if an RFP is worth the effort in minutes rather than hours. The results speak for themselves, we recently won our first bid, which we initially found on Leads!"

Kiana Stringfield

Founder, AKOMAKONNECT

A week of proposal work, based on the published terms.

A week of proposal work, based on the published terms.

Unlocking access to government contracts

one RFP at a time.

Sign up for RFP Insights

We'll send you RFP insights and relevant updates to help you gain a competitive edge.

© 2026 RFPGo.ai, All rights reserved

Unlocking access to government contracts one RFP at a time.

Sign up for RFP Insights

We'll send you RFP insights and relevant updates to help you gain a competitive edge.

© 2026 RFPGo.ai, All rights reserved

Unlocking access to government

contracts one RFP at a time.

Sign up for RFP Insights

We'll send you RFP insights and relevant updates to help you gain a competitive edge.

© 2026 RFPGo.ai, All rights reserved