Back

Alameda County

· County

· California

Elevator Condition Assessment & Modernization Plan

PROPOSALS DUE

November 25, 2026, 2:00 pm PST

6 days left

Deadline moved · was Nov 17 → now Nov 25 · +8 days

Account required

Free

The analysis, changes and answers on up to 5 RFPs a week. AI search and RFP matches included.

The analysis on up to 5 RFPs a week, plus AI search and RFP matches.

No account required

$9

This RFP has changed 4 times.

Get an email at the next change, through the deadline, plus the analysis cited to its source documents.

An email at the next change, through the deadline, plus cited analysis.

WHAT THEY WANT

(Summarized from the RFP)

The County of Alameda General Services Agency, Building Maintenance Department, is seeking a qualified consulting firm to perform a comprehensive condition assessment of the elevators at three County buildings in Oakland, California, and to develop and help implement a plan to modernize them. The buildings are 1106 Madison Street (two hydroelectric passenger elevators, built 1999), 1111 Jackson Street (three overhead traction passenger elevators, built 1970) and 1401 Lakeside Drive (four overhead traction passenger elevators, built 1982). The County does not know when the elevators were last modernized and wants a turnkey approach that identifies all infrastructure work needed to deliver modernized, code-compliant elevators acceptable to every authority having jurisdiction. The work has six phases. Phase 1 is a site assessment and report for each location covering equipment condition, near-term maintenance and repair needs, modernization recommendations, potential reuse of existing equipment, repair plans, budget information and a project schedule. Phase 2 is preparation of modernization specifications in Construction Specifications Institute MasterFormat for each location, delivered within six weeks of the assessment report. Phase 3 supports bidding on separate modernization solicitations, including pre-bid meetings, bid review assessments and award recommendations. Phase 4 is review of submittals and shop drawings. Phase 5 covers construction oversight, including a site visit at 50 percent completion and a final punch-list visit per location, plus technical recommendations on requests for information and change orders within set response times. Phase 6 is warranty-period inspections at six months and at the end of the warranty.

WHAT OTHERS ASKED

13 questions answered

▶

Can the number of meetings be quantified for each phase of the project? For example, how many meetings are to be included in Phase 1, 2, 3, and 5?

Scope/requirements

▶

Is a QEI certification from National Association of Elevator Contractors (NAEC) acceptable? NAEC is a nationally recognized firm. The RFP states NAESA.

Eligibility

▶

Has the County anticipated the number of meetings for each phase?

Scope/requirements

▶

Hi N. Feigenbaum, We are preparing our response to RFP 902787 – Elevator Condition Assessment & Modernization Plan and would appreciate clarification on the following items: 1. **SLEB Participation** Blackstone Elevator Consulting is not currently an Alameda County-certified SLEB. Please clarify what portions of the professional elevator consulting scope may be subcontracted to a certified SLEB to satisfy the 20% participation requirement without conflicting with the RFP’s restrictions on subcontracting direct project services. If sufficient subcontracting opportunities do not exist, is a SLEB waiver or exception available, and what is the required process? 2. **DIR / California Licensing** Please confirm whether a professional elevator consulting firm providing condition assessments, modernization specifications, bid support, submittal review, and construction administration is required to: - Register with the California Department of Industrial Relations as a Public Works Contractor; - Hold a California Contractors State License Board license; and/or - Hold any California architectural or professional engineering license beyond the QEI and other credentials identified in the RFP. 3. **Related Building / Infrastructure Design** The RFP requests a turnkey approach identifying all infrastructure work required for the elevator modernizations. Please clarify whether the consultant is expected only to identify and define associated electrical, structural, fire alarm, HVAC, architectural, and other related work, or whether the consultant must provide full engineering/design documents and professional seals for those disciplines. 4. **Meetings and Site Visits** The RFP states that the County will have sole discretion regarding the quantity and frequency of meetings and site visits. For purposes of fixed Phase pricing, may bidders base their fees on the minimum visits specifically identified in the RFP, with additional County-requested visits beyond those minimums handled through an approved change order/additional service? 5. **Construction Follow-Up Visits** Phase 5 requires at least one 50% construction observation and one final/punch-list visit per location, plus follow-up reviews as needed. Please clarify how many follow-up site visits bidders should include in their fixed Phase 5 pricing and whether additional visits resulting from contractor deficiencies or incomplete punch-list work would be considered additional services. 6. **Separate Bid Solicitations / Rebids** The RFP notes that the County may issue separate modernization solicitations for each of the three locations. Should Phase 3 pricing assume three separate complete bidding processes? If a project must be rebid for reasons outside the consultant’s control, would the rebid be treated as an additional service? 7. **Submittal Review Cycles** For Phase 4 pricing, how many submittal/shop-drawing review cycles should bidders assume? If contractor submittals require multiple resubmissions because of noncompliance, would reviews beyond the assumed number be considered additional services? 8. **Warranty Period** Please confirm the anticipated modernization contractor warranty period and whether Phase 6 pricing should include exactly two warranty inspections per location—one at six months and one near warranty expiration. 9. **Contract Term vs. Modernization Schedule** The consulting contract is stated as three years with two optional renewal years. Does the County anticipate completing assessment, bidding, construction, and warranty services for all three locations within the initial three-year term? If modernization construction or warranty obligations extend beyond the initial term, how will the consultant’s remaining services be authorized and compensated? 10. **QEI Requirement** The RFP states that staff performing work on the project must hold current NAESA QEI certification. Please clarify whether this applies only to personnel performing field inspections and technical elevator assessments, or to every team member performing project management, specification preparation, bid review, administrative support, and other non-field services. 11. **Five-Year Firm Qualification** Please clarify whether the five-year minimum qualification must be satisfied by the legal bidding entity itself, or whether a firm in operation for less than five years may demonstrate compliance through key personnel with more than five years of directly comparable elevator consulting experience. 12. **County Records and Site Access** Please confirm what existing documentation the County will provide to the selected consultant, including available maintenance records, callback/repair histories, annual and five-year test reports, violation records, certificates/permits, original or as-built drawings, prior modernization documents, and existing electrical/fire alarm information. Will the County’s current elevator maintenance contractor also provide personnel to facilitate safe access to car tops, hoistways, pits, and machine spaces during the condition assessments? 13. **Invoice / Progress Review Frequency** The deliverables include invoice review and recommendations based on observed modernization progress. Please clarify the anticipated frequency or number of contractor payment-application/invoice reviews bidders should include in Phase 5 pricing. 14. **Hazardous Materials / Destructive Investigation** Please confirm whether hazardous-material testing, asbestos/lead surveys, destructive investigation, and specialty testing outside normal visual elevator assessment are excluded from the base scope unless specifically authorized as an additional service. Thank you for your assistance. We want to make sure our proposal is fully aligned with the County’s expectations and pricing assumptions. Best regards, Rory Mach Senior Consultant Blackstone Elevator Consulting, Inc. 312-493-0810 rory@blackstoneec.com

Eligibility · Preference · Compliance · Scope/requirements · Pricing · Award & contract

▶

Are phase prices fixed for the full term, including renewals, or may escalation apply in the renewal years?

Pricing · Award & contract

▶

Are the site Total Cost and Grand Total rows calculated as sums of the phase prices?

Pricing

All 13 answers, in full.

ABOUT THIS RFP

RFP number

902787

Budget

Not Assigned

Published

Entity type

County

State

California

Summarized from the Alameda County portal.

HOW TO SUBMIT

Proposals must be submitted online as a PDF file (preferably a single file of 20 MB or less) through the County of Alameda Procurement Portal on OpenGov; no hardcopy, email or facsimile proposals are considered. Page limits, required forms and contacts are in the full RFP.

NAICS CODES & TAGS

541330

541350

Architecture and Engineering Design

Building Code Assessment

Construction Management and Owner Representation

ACROSS 1,040 RFPS

MORE THAN

1 in 5

1 in 5

RFPs changed their terms while active.

RFPs changed their terms while active.

4 changes filed on this RFP — now due Nov 25, was Nov 17.

4 changes filed on this RFP — now due Nov 25, was Nov 17.

Bid on five RFPs, and the odds are better than two in three that at least one changes its terms before the deadline. Larger firms have staff watching this. So can you. Get every change on this RFP for $9, or every RFP free for 7 days.

A week of proposal work, based on the published terms.

DAY 1 · PUBLISHED

PUBLISHED

DAY 18 · CHANGE

DAY 28 · DUE

DUE

28 days is the median window from publication to due date; day 18 is the median first change for the 216 that changed. 1,040 RFPs published and due between July 23 and Oct. 31, 2026.

Bid on RFPs like this often?

Leads plan

Leads gives you every active RFP in CA, WA, OR and ID, matched to your firm, and what you need to decide on each.

Find the right RFPs: search in your own words, see your matches and get a weekly digest

Decide whether to bid: who can bid, insurance, key dates and who to ask, cited to the documents

Bookmark and track RFPs: every change and answer tagged by what it affects, with emails on the RFPs you track

7 days free, then $59/mo, or $47/mo billed annually. Cancel anytime.

Unlocking access to government contracts

one RFP at a time.

Sign up for RFP Insights

We'll send you RFP insights and relevant updates to help you gain a competitive edge.

© 2026 RFPGo.ai, All rights reserved

Unlocking access to government contracts one RFP at a time.

Sign up for RFP Insights

We'll send you RFP insights and relevant updates to help you gain a competitive edge.

© 2026 RFPGo.ai, All rights reserved

Unlocking access to government

contracts one RFP at a time.

Sign up for RFP Insights

We'll send you RFP insights and relevant updates to help you gain a competitive edge.

© 2026 RFPGo.ai, All rights reserved