Back

City of Vallejo
· City
· California
Prepare Report, Grant Application Support for Construction, Design, PS&E, and Construction Support for Mare Island Causeway Bridge Control System Project
PROPOSALS DUE
December 10, 2026, 4:00 pm PST
55 days left
WHAT THEY WANT
(Summarized from the RFP)
The City of Vallejo Public Works Engineering Division is seeking a multidisciplinary engineering consultant team to evaluate, design and support the rehabilitation of the control system on the Mare Island Causeway Bridge. The bridge is a steel vertical lift span that carries G Street over the Napa River near State Routes 29 and 37, and it shares its approaches with an active railroad.
DOCUMENT SET
1 document
· 3.1MB
CHANGES SINCE PUBLISHED
No amendments recorded yet. If the entity publishes changes, they will be summarized here.
WHAT OTHERS ASKED
No questions answered in writing yet — when the government entity answers, each one lands here, with the ones that change who can bid called out.
ABOUT THIS RFP
RFP number
Not Assigned
Budget
Not Assigned
Published
Entity type
City
State
California
Summarized from the City of Vallejo portal.
HOW TO SUBMIT
Sealed paper proposals are mailed to the City of Vallejo Department of Public Works, Engineering Division, PO Box 3068, Vallejo, CA 94590, or delivered to the Public Works Director, 4th Floor City Hall, 555 Santa Clara Street, Vallejo, CA, Attention: Sam Kumar, Senior Civil Engineer. Enclose the proposal in a package marked in capital letters MARE ISLAND CAUSEWAY BRIDGE CONTROL SYSTEM PROJECT (MICBCS); CONSULTANT SERVICES (DO NOT OPEN WITH REGULAR MAIL). Provide one original and two duplicates, three copies in total. The proposal is limited to "no more than twenty five (40) pages" as printed (confirm the figure with the City) of 8.5 by 11 inches, excluding certifications and insurance forms, and must include Exhibit 10-Q (Disclosure of Lobbying Activities), Exhibit 10-H (Cost Proposal) and Exhibit 10-K (Consultant Certification of Contract Costs and Financial Management System). The cost proposal is part of the proposal in a separate cover and gives a fixed fee for each task with a fee schedule and sub-consultant costs shown per task.
NAICS CODES & TAGS
541330
541620
Architecture and Engineering Design
Environmental Consulting
Regulatory Compliance and Permitting
ACROSS 539 RFPS
MORE THAN
RFPs changed their terms while active.
25 days is the median window from publication to due date; day 16 is the median first change for the 113 that changed. 539 RFPs published and due: July 23 - Sept. 30, 2026.
Bid on five RFPs, and the odds are better than two in three that at least one changes its terms before the deadline. Larger firms have staff tracking this. Start free and you’ll have it at your fingertips too.
Free to open
free account required
A free account opens this RFP in full, starting with the rest of the description above — and 5 RFPs a week, no card.
Changes since published
Every amendment filed after it goes out, summarized.
What others asked
Every question the government entity answers in writing, with the ones that matter called out.
The documents
The set as published, in one folder or as direct links to the document.
Matched to you
The RFPs that fit the NAICS codes and tags you save; open up to 5 a week in full.

